Saturday 30 January 2010















Here are a few pictures of our apprentice cabin (a work in progress).



The Cabin has a full washroom with toilet, sink and shower. The tonge and groove 1" boards are 90% complete in the bathroom with only the ceiling and just above the shower left.





As it can be seen from this photo a loft has been constructed over the entry and washroom area. Once the floor is install in the loft it will make an ideal spot for a matress and sleeping quarters leaving the entire main floor area available for a living room. The picture also shows the insulation and vapour barrier that has been install in the rafters. The walls in the main living area still require the application of insulation, vapour barrier and tonge and groove boards. Tonge and groove boards are also planned for the ceiling. The insulation of the washroom was previously completed prior to installing the tonge and groove.




The next picture is the best one I could get of the main living area as it is hard to take good pictures of smaller rooms. Where the table is located now we could see installing a small wood stove with a flat top which would allow for heating the cabin as well as making coffee, tea, or cooking a small meal.





Here is a picure of 10,000 sq.ft green house now under construction.




Lark is our draft horse which we are planning to use on the farm this year.




No comments: